Below is what you will be expected to produce for any DNO Engineer that is involved in this level of connectivity planning. The bespoke videos we have developed will enable you to carry out these tasks. We have put all the videos needed for this task into one package for easy purchase, and it works out much cheaper for you the end user.
Power System Modelling
The Power System Modelling Will Show All Aspects Related to the Power Systems required.
The Power System Modelling and Simulation Training Videos will analyses all aspects related to the:
- Electrical Power Flow During Normal Operation
- Optimization Of Electrical Power Flow and Sizing
- Electrical Power Flow During Abnormal Operation, As Described Below.
- Transients Status of The Electric Power System
- Dynamic Loads Behavior and How They Affect the Power System
- Special Investigation of The Electromagnetic Field
- Harmonics Generated into The Power System Caused by Switching Or Non-Linear Magnetic Core Saturation
- Special Case of Resonance or Traveling Waves In Correlation To The Grounding System
A severe short circuit fault in your power system can have catastrophic consequences. This makes short circuit study training fundamental. Fault levels vary from system to system, and location to location. Our training will help you to calculate the maximum available short circuit current at various points throughout the system.
Calculated values are then used to evaluate the application of protective devices, and to develop circuit breaker trip settings, which is part of a Power System Coordination Study.
The reliability and safety of electric power distribution systems depend on accurate and thorough knowledge of short-circuit fault currents that can be present, and on the ability of protective devices to satisfactorily interrupt these currents. Knowledge of the computational methods of power system analysis is essential to engineers responsible for planning, design, operation, and troubleshooting of distribution systems.
Such knowledge is necessary to determine the interrupting requirements of circuit breakers and fuses, the mechanical and thermal requirements of devices exposed to fault currents, and to perform protection and coordination studies. A full and complete understanding of short-circuit fault currents is essential for the proper and safe coordination of power system coordination and arc flash mitigation.
OBJECTIVES:
Upon completion of your training, your models shall be able to:
- Identify And Correct Electrical Problems Related to Over and Undervoltage.
- Perform Load Flow Calculation and Sizing
- Perform Optimization of The Electrical Power Flow
- Sizing Of the Major Electrical Equipment and Power Cables
- Calculation Of the Electromagnetic Field Stressing the Insulation
- Grounding Calculation
- Estimate Resonant System and Traveler Waves on The Power System
- Utilization Of Plant Equipment.
- Perform Per-Unit Calculations.
- Define Short Circuit Calculations and Methods.
- Develop The Procedures for Selecting Medium Voltage NEMA Class E2 Motor Starters.
Power Generating Module Document Type C / D
Shown below in Red are the tests that any DNO engineer will be expecting to see Modelling for, and please remember the DNO Engineering department can request modeling for any project they decide would benefit from such a report.
This DNO requested 8 testing simulations to be carried out where modelling is required.
In our video training package, you are shown all 8 models.
| Form C2-1 Part 1 – Compliance Requirements for Synchronous Power Generating Modules | ||||
G99 Reference | Compliance Requirement of the Power Generating Module | Submission Stage | Evidence Requested (and / or) | Generator’s Statement (Provide document references with any additional comments) |
18.2.1, 18.2.3, 18.4.1 | Confirmation that a completed Standard Application Form has been submitted to the DNO | A, IS, ION, FONS | P, MI, D | |
| 14.3 | Site Responsibility Schedule | E | D | |
| 9.4.2 | Power Quality – Voltage fluctuations and Flicker: The installation shall be designed in accordance with EREC P28 | IS, ION | MI, D, TV, S | · EREC P28 was first published in 1989 to provide recommended planning limits for voltage fluctuations for connection of equipment to public electricity supply systems in the UK. Issue 1 was primarily concerned with assessment of voltage fluctuations and associated flicker produced by traditional domestic, commercial and industrial loads. |
| 9.4.3 | Power Quality – Harmonics: The installation shall be designed in accordance with EREC G5 | IS, ION | MI, D, TV, S | · The latest Engineering Recommendation (EREC) G5 issue 5 comes into effect for connection offers issued from 17th June 2020. This latest revision, published by Energy Networks Association (ENA), provides new harmonic planning levels and assessment processes for the connection of harmonic sources and/or resonant plant to the network. |
| 13.5 | Reactive Power capability Confirm compliance with Section 13.5 by carrying out simulation study in accordance with C.7.3 and by submission of a report | IS, ION | S, MI | Section 13.5 Reactive Capability of G99/2 All Synchronous Generating Modules shall be capable of satisfying the Reactive Power capability requirements at the Connection Point as defined in Figure 13.11 when operating at Registered Capacity. In some cases, for example, on large industrial sites etc where the Power Generating Module is embedded in the Generator’s Installation, the DNO may specify a performance requirement for the Power Generating Module that fits within the rectangular boundary defined in Figure 13.11, ie an envelope agreed between the DNO and the Generator within the rectangle of Figure 13.11. In such cases the DNO and Generator might agree a different control point, such as the Power Generating Module‘s terminals. The performance requirements of the control system including Slope (where applicable) shall be agreed between the DNO and the Generator. And C.7.3 |
| 13.4 | Voltage Control and Reactive Power Stability Confirm compliance with Section 13.4 by carrying out simulation study in accordance with C.7.4 and by submission of a report | IS, ION | S, MI | Voltage Limits and Control Where a Power Generating Module is remote from a Network voltage control point it may be required to withstand voltages outside the normal statutory limits. In these circumstances, the DNO should agree with the Generator the declared voltage and voltage range at the Connection Point. Immunity of the Power Generating Module to voltage changes of ± 10% of the declared voltage is recommended, but is mandatory for Type D Power Generating Modules, subject to design appraisal of individual installations. And C.7.4 |
| 13.2 | Confirm that the plant and apparatus is able of continue to operate during frequency ranges and to withstand the rate of change of frequency specified in 13.2.1 and 13.2.2 | IS | MI, TV | |
| 13.2.4 | Limited Frequency Sensitive Mode – Over frequency and Frequency Sensitive Mode Confirm the compliance with 13.2.4 by carrying out simulation study in accordance with C.7.6 and by submission of a report. | IS, ION | S, MI, TV | · Limited frequency sensitive mode at over frequency (LFSM-O) is to be activated, when the system is in an emergency state of over frequency and needs fast reduction of active power production. Consequently, all frequency containment reserves (FCR) in negative direction have already been deployed. |
| 13.2.5 | Limited Frequency Sensitive Mode – Under frequency Confirm the compliance with 13.2.5 by carrying out simulation study in accordance with C.7.7 and by submission of a report. | IS. ION | S, MI, TV | · Limited frequency sensitive mode at underfrequency (LFSM-U) is to be activated, when the system is in an emergency state after of underfrequency and needs fast increase in active power production. Consequently, all frequency containment reserves (FCR) in positive direction have already been deployed. |
| 13.1.3 | Confirm the Active Power set point can be adjusted in accordance with instructions issued by the DNO | IS, ION | MI, TV | ||
| 13.3 | Fault Ride Through Confirm the compliance with 13.3 by carrying out simulation study in accordance with C.7.5 and by submission of a report. | IS, ION | S, MI, TV | What does FRT stand for in Electrical Engineering?
· In electrical power engineering, fault ride through ( FRT ), sometimes under-voltage ride through ( UVRT ), or low voltage ride through ( LVRT ), is the capability of electric generators to stay connected in short periods of lower electric network voltage (cf. voltage sag ). Fault Ride Through Paragraphs 13.3.1.1 to 13.3.1.10 inclusive set out the Fault Ride Through, principles and concepts applicable to Synchronous Power Generating Modules and Power Park Modules, subject to disturbances from faults on the Network up to 140 ms in duration. Each Synchronous Power Generating Module and Power Park Module is required to remain connected and stable for any balanced and unbalanced fault where the voltage at the Connection Point remains on or above the heavy black line shown in Figures 13.7 to 13.10 below. The voltage against time curves defined in Table 13.3 to Table 13.6 expresses the lower limit (expressed as the ratio of its actual value and its reference 1 pu) of the actual course of the phase to phase voltages (or phase to earth voltage in the case of asymmetrical/unbalanced faults) on the network voltage level at Connection Point during a symmetrical or asymmetrical/unbalanced fault, as a function of time before, during and after the fault. | |
| 18.2.3 (e) | Confirm a detailed schedule of tests and test procedures have been provided. | IS, ION | D | ||
| Section 10 and Form C2- 2 | Interface Protection: · Over and under voltage protection · Over and Under Frequency protection · Loss of mains protection Other protection: · Details of any special protection, eg Pole Slipping or islanding As an alternative to demonstrating protection compliance with Section 10 using Manufacturers’ Information or type test reports, site tests can be | IS, ION, FONS | MI, TV, T |
| undertaken at the time of commissioning the Power Generating Module | |||||
| C.7.8 | Model validation Demonstration of the frequency control or governor/load controller/plant model, Excitation System and voltage controller by carrying out simulation studies in accordance with C.7.8 | FONS | S, MI, TV | Model validation
Demonstration of the frequency control or governor/load controller/plant model, Excitation System and voltage controller by carrying out simulation studies in accordance with C.7.8 | |
| C.4 | Excitation System Open Circuit Step Response Tests Confirm the performance requirements of a continuously acting voltage control system compliant with C.4 by testing in accordance with C.8.2 | FONS | T, MI, TV | ||
| C.4 | Open & Short Circuit Saturation Characteristics Confirm the performance requirements of a continuously acting voltage control system compliant with C.4 by testing in accordance with C.8.3 | FONS | T, MI, TV | ||
| 13.4.3 | Excitation System On-Load Tests Confirm the operation of the Excitation System on load is compliant with paragraph 13.4.3 and Annex C.4 by testing in accordance with C.8.4 | FONS | T, MI, TV |
| 13.5 | Reactive Capability Test Confirm the Reactive Power capability of the Synchronous Power Generating Module to meet the requirements of Section 13.5 by testing in accordance with C.8.5 | FONS | T, MI, TV | ||
| 13.2 | Frequency Response Tests Confirm the Synchronous Power Generating Module meets the requirements of 13.2 by testing in accordance with C.8.6 | FONS | T, MI, TV | ||
| 13.2.3 | Output Power with falling frequency Confirm the Synchronous Power Generating Module meets the requirements of 13.2.3 by testing in accordance with C.8.7 | FONS | T, MI, TV | ||
| 10.3.3 | Automatic reconnection Confirm by testing that the reconnection sequence starts after a minimum delay of 20 s for restoration of voltage and frequency in accordance with paragraph 10.3.3 | FONS | T, MI, TV | ||
| C.3 | Installation and Commissioning Form C3 completed with signed acceptance from the DNO representative | ION, FONS | D |
When you have finished watching all the videos in this training course you will wonder as we did how on earth have I not used this system before.